Context
Probability of failure on demand of safety instrumented function
Archive REF: SE4058 V2
Context
Probability of failure on demand of safety instrumented function

Author : Olivier IDDIR

Publication date: November 10, 2015 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. Context

The control of risks generated by industrial activities requires the implementation of risk control measures (RCMs), also commonly referred to as safety barriers. The aim of these safety barriers is to reduce the criticality of risks. Risk reduction generally takes the form of prevention, the aim of which is to reduce the probability of a hazardous situation occurring, and mitigation/protection, the aim of which is to limit the consequences if the hazardous situation could not have been avoided.

To reduce the probability of a hazardous situation occurring, manufacturers use various types of safety barriers, including safety instrumented systems (SIS).

The function of a SIS is to ensure the implementation of safety instrumented functions (SIF), for which an integrity level must be set. This level depends on the criticality of the hazardous...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Quality manager"

( 214 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us