Representative example
Multi-criteria optimization — Application in the construction industry

Add to my library

S7214 V1 Article

Representative example


Multi-criteria optimization — Application in the construction industry

Authors : Igal M. SHOHET, Eldad PERELSTEIN

Publication date: June 10, 2001 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

6. Representative example

The model was validated on two installations:

1) a mess hall (including a 1,000 square metre hall) serving a military base (figure 1 );

2) a teaching facility, comprising two conference halls.

The aim of the central building unit at the Ministry of Defense, which maintains these facilities, was to rehabilitate them to a level not exceeding 1.2 million NIS (New Israeli Shekel) during the coming calendar year.

The local unit required additional constraints, concerning the plant's performance level and service life, as follows:

1) Refurbishment must enable these two buildings to be used at an average but still acceptable level of performance (3 on a scale of 5);

...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Representative example

Article included in this offer

"Control and systems engineering"

( 143 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Contenus associés

Sur le même sujet

Veille personnalisée : Inscrivez-vous !

Dans les ressources documentaires

Optimisation discrète

Cet article présente les méthodes et techniques les plus usitées pour résoudre les problèmes d’optimisati...

Disponibilité des moyens de production

Les machines et les systèmes de production automatisés d'aujourd'hui doivent présenter et conserver un ex...

GMAO : choisir un logiciel

Le choix et la mise en œuvre d'un logiciel de gestion de maintenance assistée par ordinateur (GMAO) sont ...

Conception intégrée pour la surveillance robuste des systèmes

Dans cet article, l’outil bond graph à caractère multidisciplinaire est utilisé pour la conception inté...

Tous les livres blancs
Toutes les actualités
Contact us