3. Specific program management and system engineering activities at SoS level
This section describes the specific activities to be carried out for a SoS, both one-off and recurring.
3.1 Program management and systems engineering activities at SoS level
Capability roadmaps, budgetary and contractual planning, and managerial independence are all part of the timeframe for program management and system engineering activities at the SoS level. In the context of a system, these activities are grouped into the following main phases (
ISO 24748-2
,
ISO 15288
,
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Specific program management and system engineering activities at SoS level
Article included in this offer
"Control and systems engineering"
(
143 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!