8. Installation
Prior to installation, studies carried out in collaboration with the specifier and builder enable us to define :
the escalator or moving walkway as a whole ;
civil engineering to house the device;
control cabinet, depending on the operating mode selected;
interfaces with the building (layout, power supply, BMS, etc.);
how it is inserted into its sheath and installed on its upper and lower supports.
Then there's the always tricky introduction phase, with two cases to consider: the open-air staircase and the staircase positioned inside the building.
The installation and commissioning phases are normally the responsibility of the installer. The company must therefore visit the site and define a space for unloading the escalator.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Installation