9. Comments
The "condensation/potential evaporation" balance for 1 linear metre (l.m.) of facade (assuming a storey height of 3 m) is as follows:
condensation: 15.8919 g/m2 · h x 0.95 m x 3.00 m 45.2919 g/h ;
evaporation: - 0.0579 g/m2 · h x 0.05 m x 3.00 m - 0.0087 g/h ;
total condensable per m.l. of frontage: 45.2832 g/h.
The balance is largely "in favor" of condensation. This explains and justifies the construction system recommended in DTU 20.1 for masonry of small elements (walls and partitions) for the special case of double walls (type II a, II b and III walls), but which, in our opinion, should be generalized as soon as there is an air space...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Bibliography
-
(1) - DAHAN (P.) - Pathologie de l'humidité. Paroi simple. Cas concret -
Websites
AFNOR
http://www.afnor.fr
Quality and Construction Agency
http://www.qualiteconstruction.com
Météo France
http://france.meteofrance.com/
ESTP – École spéciale des travaux publics
...
Standards and norms
- Building work – Restoration of facades in service using polymer-based waterproof coatings – Part 1-1: Technical specifications – Part 1-2: General material selection criteria – Part 2: Special clauses – Commercial reference for parts P 1-1, P 1-2 and P 2 of NF DTU 42.1, November 2007 (classification index: P 84-404). - NF DTU 42.1 - 2007
- Paints and varnishes – Paint products and coating systems for exterior masonry...
Statistical and hygrothermal data
-
Readings from Météo France
Météo France has departmental centers throughout France, which are able to provide climatological information on the location of the building, which must be the subject of a hygrothermal study.
On written request, each center provides climatic data (temperature and relative humidity) at the desired intervals.
For our case study, we used hourly...