3. Concrete veil + ITI (60 + 10), summer season
The air gap created by the glue beads is taken into account.
Below is the calculation note for the table needed to draw the Glaser diagram.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Concrete veil + ITI (60 + 10), summer season
Bibliography
-
(1) - DAHAN (P.) - Pathologie de l'humidité. Paroi simple. Cas concret -
Websites
AFNOR
http://www.afnor.fr
Quality and Construction Agency
http://www.qualiteconstruction.com
Météo France
http://france.meteofrance.com/
ESTP – École spéciale des travaux publics
...
Standards and norms
- Building work – Restoration of facades in service using polymer-based waterproof coatings – Part 1-1: Technical specifications – Part 1-2: General material selection criteria – Part 2: Special clauses – Commercial reference for parts P 1-1, P 1-2 and P 2 of NF DTU 42.1, November 2007 (classification index: P 84-404). - NF DTU 42.1 - 2007
- Paints and varnishes – Paint products and coating systems for exterior masonry...
Statistical and hygrothermal data
-
Readings from Météo France
Météo France has departmental centers throughout France, which are able to provide climatological information on the location of the building, which must be the subject of a hygrothermal study.
On written request, each center provides climatic data (temperature and relative humidity) at the desired intervals.
For our case study, we used hourly...