4. Scaffolding acceptance
Once the scaffolding has been erected :
the site manager checks that the scaffolding complies with
the specifications, the provisional plan and the regulations (Decree
of December 21, 2004);
acceptance is evidenced by a written document signed jointly
by the specialist installer and the user: the verification report,
before the scaffolding is put into service (or put back into service),
the contents of the report, together with the verification report
and the summary sheet drawn up by SFECE.
All signed documents must be kept on site, and a photocopied copy
kept at head office in the site file.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Scaffolding acceptance
Standards and norms
- Personal fall protection
equipment – Anchoring devices - NF EN 795 - Mars 2016
- Personal protective
equipment against falls from a height – Fall arrest harness - NF EN 361 - Septembre 2002
Regulations
Order of December 21, 2004 (text no. 36) relating to scaffolding
inspections and amending the appendix to the order of December 22,
2000 relating to the conditions and procedures for approving bodies
to check the conformity of work equipment.
CNAM Recommendation R. 457 adopted by the CTN on May 10, 2011
concerning foot scaffolding.
Directory
Manufacturers – Suppliers – Distributors
(non-exhaustive list)
Scaffolding storage
http://www.entrepose-echafaudages.com/
Duarib
https://www.duarib.fr/
Comabi
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!