6. Examinations, checks and tests
The decree of 1er March 2004 stipulates that after the appliance has been installed in a building, it must be checked before being put back into service. This check consists of :
SCROLL TO TOP
It must be carried out every six months for motorized...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Examinations, checks and tests
Bibliography
-
(1) - CNAMTS - Recommandation R. 433 – Exploitation, Installation, utilisation, repli des plates-formes suspendues motorisées -
-
(2) - CNAMTS, INRS, OPPBTP - Guide ED6110 – Prévention des risques de chutes de hauteur -
-
(3)...
Standards and norms
- Safety requirements for variable-level suspended platforms – Calculations, stability, construction – Examinations and tests – Variable-level suspended platforms - NF EN 1808 - Juillet 2015
- Matériels de mise à plates-formes de travail se déplaçant le long de mât(s) - NF EN 1495 +A2 - Septembre 2009
Regulations
Labor Code
Article R. 4323-55-57 – Handling of mobile work equipment or equipment for lifting loads
Articles R. 4323-22 to R. 4323-27 – Work equipment checks
Articles R. 4323-104 to R. 4323-106 – Current periodic PPE inspections
Articles R. 4324-1 to R. 4324-45 – Work equipment for lifting workers
Arrêté du 1er mars 2004 relatif aux vérifications des appareils et accessoires de levage
...
Directory
Manufacturers – Suppliers – Distributors (non-exhaustive list)
PERI (groupe doka, layher, meva, hunnebeck)
https://www.peri.fr/products-overview.html
SECATOL
http://www.secatol.fr
SCANCLIMBER
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!