Site installation – Platform assembly
Suspended platforms

Add to my library

TBA620 V2 Article

Site installation – Platform assembly
Suspended platforms

Author : Pierre SERIN

Publication date: October 10, 2019 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Site installation – Platform assembly

Site installation and platform erection must comply with the following steps:

  • prepare packing, delivery, means of transport and unloading;

  • mark out location and access paths ;

  • make sure the soil is load-bearing ;

  • install the suspension devices, taking into account the centre-to-centre distance of the winches attached to the platform stirrups;

  • hang cables on suspension devices, one hanging point per cable;

  • carefully lower the cables to the ground using a rope;

  • fit high limit stops (use of electric winches) ;

  • assemble the floor platforms vertically to the suspension devices ;

  • mount winches...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Site installation – Platform assembly

Article included in this offer

"Preparing for construction"

( 121 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us