2. Project sites
The project involves more than twenty sites. While some have very similar processes, they can also be very different. So we're in no way talking about an "identical" deployment. To illustrate this a little better, we'll take two examples from among the sites installed, and give an idea of the different levels of automation encountered at different sites.
SCROLL TO TOP
2.1.1 General
A crushing production order (PO) is used to crush the raw materials (RM) from the bins stored in the cold room, then send them...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Project sites
Bibliography
-
(1) - SCHOLTEN (B.) - The road to integration: A guide to applying the ISA-95 standard in manufacturing - (2007).
Also in our database
-
ALLOT (P.) - MES – Pilotage et suivi des fabrications pensés comme un système intégré -
Standards and norms
- Enterprise-Control System Integration – Part 1: Models and Terminology (IEC 62264-1:2010) - ANSI/ISA-95.00.01-2010 - 2010
- Enterprise-Control System Integration – Part 2: Object Model Attributes (IEC 62264-2:2015) - ANSI/ISA-95.00.02-2010 - 2010
- Enterprise-Control System Integration – Part 3: Activity Models of Manufacturing Operations Management (IEC 62264-3:2007) - ANSI/ISA-95.00.03-2013 - 2013
- Enterprise-Control...
Software tools
COOX MES platform (ORDINAL Software) and MESbox modules.
Websites
SARIA (the source of most business information)
http://www.saria.fr
OET
http://www.oet.fr
The MES Club (French players in the MES field)
https://www.club-mes.org/
ISA
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!