2. Preventive EMC analysis
The starting point for any EMC design work must be based on a preliminary analysis of the various risks that will need to be addressed in order to develop a coherent plan for meeting these requirements. The EMC performance of a piece of equipment depends on the functions used, but also on their integration and links with the PCB, mechanics, wiring and vehicle architecture, and software, as illustrated in Figure 1. The preliminary work must identify, based on the functions used, which interactions with other disciplines, such as mechanics or software, are strong and necessary.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Preventive EMC analysis
Bibliography
-
(1) - LAFON (F.) - Développement de techniques et de méthodologies pour la prise en compte des contraintes CEM dans la conception d'équipements du domaine automobile. Étude de l'immunité du composant à l'équipement. - Ph. D INSA de Rennes (2011).
-
(2) - Commission Électrotechnique Internationale - CEI 61967-2:2005 –...
Also in our database
-
BOYER (A.), STOJANOVIC (M.), LOUDIERE (K.), LAFON (F.), SERPAUD (S.) - Gestion de l'obsolescence des composants pour la CEM. -
Standards and norms
- Integrated circuits – Measurement of electromagnetic emissions, 150 kHz to 1 GHz – Part 2: Measurement of radiated emissions – TEM cell method and broadband TEM cell - IEC 61967-2 - 2005
- Integrated circuits – Measurement of electromagnetic emissions – Part 4: Measurement of conducted emissions – Direct coupling method 1 ohm/150 ohms - IEC 61967-4 - 2021
- Integrated circuits Measurement of electromagnetic...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!