ABSTRACT
A mining risk prevention plan is an operational tool for managing residual risks in mining through rules for urban planning and construction. It is also a prevention tool designed to preserve the safety of persons and prevent damage to constructions, while not impinging unacceptably on local living conditions.
Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.
Read the article
The establishment of mine risk prevention plans (PPRM) is part of the prevention policy implemented by the State to ensure the safety of people and the protection of property, while enabling territories to develop in a balanced way.
These plans, which are based on current knowledge of risks, are drawn up in consultation with local authorities by the State, which is responsible for implementing them as part of the management of town planning authorizations.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
KEYWORDS
mining risk
| cave-in
| Constructibility
| flood
| landslide
Ongoing reading
Mining risk prevention plan
Bibliography
Other documents
-
Guide méthodologique de l'INERIS pour l'élaboration des plans de prévention des risques miniers intitulé - L'élaboration des Plans de Prévention des Risques Miniers – Volet technique relatif à l'évaluation de l'aléa – Les risques de mouvements de terrain, d'inondations et d'émissions de gaz de mine. -
-
Guide...
Websites
http://www.brgm.fr BRGM website
http://www.ecologie.gouv.fr French Ministry of Ecology and Sustainable Development website.
https://www.legifrance.gouv.fr/ Service public de la diffusion du droit
Regulations
Codes
Mining Code, in particular article L. 174-5
Code de l'environnement, in particular articles L. 125-2, L. 562-1 to 9 and R. 125-9 to 27 and R 561 to R 566s
Code de l'urbanisme notably articles L. 151-43, L. 152-7, L. 153-60 and L. 443-2 and R 111-2, R 431-16
Code de la construction et de l'habitation notably article R. 126-1
Code général des collectivités territoriales, in particular articles...
Data
List of PPRM (non-exhaustive)
-
Source DREAL Alsace-Champagne-Ardenne-Lorraine
In the Lorraine region, 165 communes are affected by mining hazards and 21 PPRMs have been prescribed for 71 communes:
42 communes in Meurthe-et-Moselle (54) ;
26 communes in Moselle (57) ;
3 towns in the Meuse department (55).
All are enforceable,...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!