3. Operator feedback on the AP913 approach
Since the first pilot implementations of the AP913 process in U.S. power plants in 2001, assessments have been carried out and presented in numerous papers at international conferences dedicated to AP913 maintenance (EPRI, IAEA). Results are often mixed, and depend to a large extent on the commitment of managers and executives to the long-term implementation of all the resources required to carry out the AP913 process. In general, we see a reduction in unplanned downtime and an increase in availability of between 3% and 5%. On the positive side, there are fewer interventions and replacements following unplanned shutdowns or the discovery of damage, better management of maintenance operations and improved equipment reliability over the lifetime of the plant. On the other hand, the number of condition monitoring tasks, preventive maintenance and systematic replacements is increasing significantly, by...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Operator feedback on the AP913 approach
Bibliography
-
(1) - Institute of Nuclear Power Operations, INPO AP913 - Equipment reliability process description. - AP913, Revision 4, nov. 2001.
-
(2) - KEMENY (J.) - Report of the president's commission on the accident at three mile island : the need for change : the legacy of TMI. - The Commission, Washington, oct. 1979.
Also in our database
-
BACHER (P.) - Réacteurs nucléaires. Généralités. - [BN 3 020] (2005).
...
Websites
EPRI website providing access to the PMBD – Preventive Maintenance Basis Databasehttp://pmbd.epri.com (page consulted on December 23, 2015)
NRC website providing access to EPIX http://nrcoe.inl.gov (page consulted on December 23, 2015)
Curtiss – Wright Corporation website providing access to...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!