HAZOP: a method for risk analysis - Implementation

Add to my library

SE4032 V1 Quizzed article

HAZOP: a method for risk analysis - Implementation

Author : Michel ROYER

Review date: September 2, 2020 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

Overview

ABSTRACT

The HAZOP (Hazard and operability studies) method is a systematic method and a powerful tool in the domain of processes and engineering in order to identify deviations on a new facility or a facility in operation. Its implementation requires the creation of work group gathered around a team leader guardian (guarantor of the method) ;a pluridisciplinary team with an in depth knowledge of the facility described on detailed plans. The objective of this team is to assess and identify potentially hazardous risks for individuals, property and the environment. This article is dedicated to the implementation of the HAZOP method and presents in particular its actors, proceedings and expected deliverables.

Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.

Read the article

AUTHOR

 INTRODUCTION

As we indicated in [SE 4 030] , implementation of the HAZOP method (Hazard and operability studies) requires the creation of a working group led by a facilitator, who is the guarantor of the method, and comprising a multidisciplinary team with in-depth knowledge of the plant described on detailed plans. It therefore requires the mobilization of a multi-disciplinary team over long periods, and the collection of numerous documents to model the installation [SE 4 031] .

In this third section, devoted to the implementation of the HAZOP method, we present the different components of the work team, after having drawn up a list of the various documents to be assembled. This is followed by a description of the various working meetings and the final documents to be produced. Finally, a short illustration of an application is given.

The bibliographical references are grouped together in the document sheet [Doc. SE 4 033] .

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
HAZOP: a method for risk analysis - Implementation

Article included in this offer

"Safety and risk management"

( 477 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us