4. CMS commissioning check
The inspection is carried out on equipment subject to declaration.
For steam generators and devices with removable CAFR quick-closing
lids, a CMS is carried out by an authorized body. The request must
be made by the operator. For other equipment, the inspection is carried
out by a competent person appointed by the operator.
Pressure equipment that has undergone a major intervention undergoes
a new conformity assessment and is treated as new equipment.
This check should be carried out once the equipment has been installed
and is ready for use.