6. Production of the work
It is beyond the scope of this document to cover all the procedures involved in the devolution and execution of the work. This will only be done in the light of the project manager's mission and the obligations incumbent on the project owner. It is assumed that all administrative procedures relating to the surveys and the awarding of work contracts have been carried out in accordance with the rules, and that the selected contractors have each received notification of the contract and a work start-up order.
If commissioned by the project manager, they include the preparation of execution and detail drawings for all the elements of the work, which should not require any additional studies by the contractor.
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Production of the work
Bibliography
References
-
(1) - - Fascicule 39, Fascicule 70, Fascicule 71, Fascicule 73, Fascicule 74, Fascicule 75, Fascicule 76, Fascicule 81-titre I, Fascicule 81-titre II. Journal officiel ou bulletin officiel du MEEDDAT. Disponibles sur le site Internet : http://www.construction.equipement.gouv.fr
...
Also in our database
-
DUCROT (B.), FARGEOT (B.), MATHIEU (G.) - Stockage de l'eau : ouvrages en béton. -
Regulations
Arrêté du 21 décembre 1993 précisant les modalités techniques d'exécution des éléments de mission de maîtrise d'œuvre confiés par des maîtres d'ouvrage publics à des prestataires de droit privé [NOR : EQUU9301426A] (JORF n° 10 du 13 janvier 1994, page 713)
Arrêté du 22 décembre 1994 fixant les prescriptions techniques relatives aux ouvrages de collecte et de traitement des eaux usées mentionnées aux articles L. 372-1-1 et L....
Websites
National Commission for Public Debate (CNDP) http://www.debatpublic.fr/
Official Journals http://www.journal-officiel.gouv.fr/
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!