6. Manage interfaces with stakeholders and their potential impacts
Industrial contracts for equipment or installations involve a multitude of stakeholders. The scope of the project, which leads to a segmentation into work packages (derived from the WBS – work breakdown structure), will generate a multitude of interfaces to be mastered.
On the manufacturer's side, this starts with specialized design offices, each working on their own products.
Various engineering trades (mechanical, electrical and automation) will be involved.
All these stakeholders will find themselves involved in interfaces during the integration of the final installation. It is not uncommon to find discrepancies at these interfaces, which may require the sub-assemblies to be redesigned so that they fit together perfectly.
Consortium contracts involving companies from different cultures (countries, professions, reference systems, etc.) will also generate interface problems...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Manage interfaces with stakeholders and their potential impacts
Bibliography
Also in our database
-
(1) - Démarche d'optimisation en début de phase d'exécution d'un projet -
Bibliography
Project Management Institute, Guide to the Project Management Body of Knowledge (PMBoK Guide ® ), 7th edition.
Websites
Project Management Institute
The Project Management Institute, founded in 1969, is a not-for-profit professional association offering project management methods. Its guide, the PMBOK, defines the fields of knowledge covering project management and identifies best professional practices in the field.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!