1. Traditional method: identifying operational skills
The input for identifying the skills required is the hierarchical breakdown of the project. The WBS (work breakdown structure) identifies the elementary tasks you want to follow within the project.
Each task corresponds to :
Each task is associated with a number of resources, each with a distinct set of responsibilities. This is done using...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Traditional method: identifying operational skills