7. Appendix 1. Subassembly WBS
This appendix contains flowcharts of the subassembly tasks:
OTP general tasks (figure 9);
OTP public works and civil engineering (figure 10);
OTP process workshops (figure 13);
OTP utility workshops (figure 11);
OTP storage – links – shipments (off-sites) (figure
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Appendix 1. Subassembly WBS
Bibliography
General reference works
-
(1) - AFITEP - Dictionnaire de management de projet - . Éd. AFNOR. 4e éd. 2000.
-
(2) - AFITEP - Le management de projet : principes et pratique - . Éd. AFNOR. 2e éd. 1998.
-
(3) - AFITEP - Actes des...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!