9. Appendix 3. Examples of material safety data sheets
The upper frame is filled in during the planning phase. The lower section is completed during the implementation phase and, at the latest, at project closure, if the threat has not materialized.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Appendix 3. Examples of material safety data sheets
Bibliography
General reference works
-
(1) - AFITEP - Dictionnaire de management de projet - . Éd. AFNOR. 4e éd. 2000.
-
(2) - AFITEP - Le management de projet : principes et pratique - . Éd. AFNOR. 2e éd. 1998.
-
(3) - AFITEP - Actes des...
Theses
-
- http://www.sudoc.abes.fr
-
OUALIDI (N.) - Contributions du management de projet dans le processus de création d'entreprise. - Université des sciences et technologies de Lille (2003)
-
NIELVILLE...
Standardization
Association française de normalisation Afnor
http://www.boutique.afnor.fr
- Systèmes de management de la qualité. Lignes directrices par le management de la qualité dans les projets (indice de classement : x 50-122-6). - FD ISO 10 006 - Déc. 2003
- Le management de projet. Concepts. - FD X 50-105 - Août 1991
- Terminologie...
Organizations
French-speaking zone
AFITEP (Association francophone de management de projet) http://www.afitep.fr (Délégations régionales dans les principales villes de France)
AFAV (Association française pour l'analyse de la valeur) http://www.afav.asso.fr
PMI Montréal http://www.pmimontreal.org
SMP (Société Suisse de management de projet)http://www.project-management.ch
SYNTEC (Chambre syndicale de l'ingénierie)...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!