ABSTRACT
There are limits to traditional Operations Planning in a supply-chain context. First, the purposes of the 3 planning levels, i.e. strategic, tactical and operational, are set.
The weaknesses of synchronization in classical MRPII planning are described next.
Finally, uncertainties supply chains face to, for example the “bullwhip effect” are analyzed. The introduction of new planning systems, APS, is consequently deducted
Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.
Read the article
AUTHORS
-
Patrick GENIN
: Supply Chain Support Manager - Audemars Piguet Manufacture SA
-
Samir LAMOURI
: University Professor at Arts et métiers ParisTech - Researcher at LAMIH CNRS
-
André THOMAS
: University Professor at Lorraine University, ENSTIB and CRAN – CFPIM
INTRODUCTION
This article identifies the limitations of traditional industrial planning in a supply chain context. This is a prerequisite for understanding the emergence of APS, which will be developed in
[AG 5 120]
.
To this end, we first present the levels associated with strategic, tactical and operational supply chain planning. We will situate the MRP II planning levels presented in
[AG 5 110]
in these hierarchical structures.
In the second part, we present the limitations of traditional MRP II planning.
The third part will look at the issues facing supply chains today, the management of variability and of the "new supply chain".
bullwip effect". In this section, we'll look at the role that tactical planning can play.
We conclude this article by analyzing the evolution of ERP systems to understand APS "Advanced Planning Systems".
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
KEYWORDS
uncertainty
| Supply chain
| MRP2
| planning
| variability
Ongoing reading
Operations Planning and limits