3. Present the joint project and outline the recommendations.
The third step consists of measuring the overall ranking of the PATs (
2
) in order to assess the level of divergence in representations (dissensus) between each of the stakeholders. At the end of this step, the PATs will be grouped together in an original way into key themes in order to structure the emergence of recommendations.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Present the joint project and outline the recommendations.
Bibliography
Also in our database
-
(1) - Mettre en œuvre un brainstorming - [FIC 0233]
- ...
Bibliography
Cardinal G., Guyonnet J.F., Pouzoulic B., The Dynamics of Trust, Dunod, 1997
Supplier
Are you looking to contact a certified facilitator who can conduct a PAT Miroir® session or obtain a license to use the PAT Miroir® software? www.pat-miroir.com
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!