1. Materials used
It includes in succession :
a load preparation station: wire-tied or arranged on fixtures or in baskets;
a preheating chamber; in the case of gas-heated carburizing furnaces, the combustion gases are recovered and circulated in the preheating cell;
the carburizing bath, consisting of a refractory steel crucible heated externally by electric resistors or gas burners. Temperature control is based on information provided by two pyrometric rods located in the bath and in the heating zone;
the pre-quench levelling bath (if justified), also known as the rinsing bath, designed to eliminate salts...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Materials used
Bibliography
Article M 1 225
-
(1) - CETIM -
Service Matériaux. – Les aciers et leurs traitements thermiques en construction mécanique
-
CETIM (1975).
-
(2) - TOURNIER (C.), MERCIER (R.) -
Les atmosphères de traitement...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!