4. Brittany: proposal for a new DC network
Brittany's geographical position poses problems for electricity transmission and distribution.
Transmission is provided by a 400 kV AC extra-high-voltage line and a 225 kV line covering a distance of 1,523 km. It is completed by 90 kV and 63 kV high-voltage lines over a distance of 2,876 km.
On an average winter's day, the difference between the power demanded and the power supplied quickly reaches 500 MW in an hour. Under current electrification conditions in Brittany, there is no possible reserve to inject power into the Breton grid in a short space of time. Most of this power has to come from the rest of France, and in the case of Finistère, for example, which is "at the end of the line", transmission losses become considerable.
Let's...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Brittany: proposal for a new DC network
Bibliography
-
(1) - DAHMANI (O.) - Évaluation de l'architecture optimale du réseau électrique d'un champ éolien offshore. -
-
(2) - BERNARD (C.), SEBRAO-OLIVEIRA (C.), LAVAL (B.), VAUDOUER (C.) - Panneau photovoltaïque et algorithme MPPT à base de logique floue. - http://www.solar-fabrik.de/
...
Also in our database
-
FOCH (H.), ARCHES (R.), CHÉRON (Y.), ESCAUT (B.), MARTY (P.), METZ (M.) - Conversion continu-continu. Hacheurs. - [D 3 160] Archives (1990).
Software tools
LabVIEW National Instruments France: Data acquisition; real-time control and command
MATLAB/SIMULINK/DSPACE Data acquisition; real-time control and command
PSIM Copyright 2001-2012 Power Systems Simulation http://www.powersimtech.com/
Directory
Submarine cables
ABB's high voltage cable unit in
Sweden
Phone : +46 455 556 00
Fax: +46 455 556 55
E-Mail : [email protected]http://www.abb.com/cables
DC grid network around Europe http://www.leonardo-energy.org/
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!