Study of the installation of a new DC network in Brittany
AC and DC Networks Association. Setting Up and Utilisation

Add to my library

D1164 V1 Quizzed article

Study of the installation of a new DC network in Brittany
AC and DC Networks Association. Setting Up and Utilisation

Author : Michel PINARD

Review date: June 24, 2021 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Study of the installation of a new DC network in Brittany

5.1 First approach: we essentially install accumulator batteries

Wind, water and photovoltaic installations produce intermittent energy that is difficult to manage. Battery storage provides a reserve that is theoretically available to local consumers in all scenarios. This approach assumes relatively low investment in renewable energies, at least in the near future. In this case, the 2 × 36 kV network can initially be reduced to a simple Brest – Quimper link in Finistère (see layout B-Q in figure 9 )....

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Study of the installation of a new DC network in Brittany

Article included in this offer

"Conversion of electrical energy"

( 279 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us