4. Techniques for working on networks
The remote working method (figure 1) has been used for many years on public distribution networks equipped with bare conductors, and has made it possible to meet the network's expansion and development needs.
The contact method (figure 2) is currently the most widely used, as it best meets the needs of networks equipped with insulated overhead or underground cables, as well as indoor installations and equipment.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Techniques for working on networks
Websites
Live working committee website
http://www.comite-tst.fr/
Events
ICOLIM: European live working conference, held every three years.
Standards and norms
Main French standards used for live working
- Operations on electrical structures and installations and in an electrical environment – Electrical risk prevention - NF C 18-510 - 2012
- Live working on low-voltage electrical installations – Preventive measures implemented – Part 1: General requirements - NF C 18-505-1 - 2013
- Live working on low-voltage electrical installations – Preventive measures...
Regulations
Directive 89/654/EEC of November 30, 1989 concerning the minimum safety and health requirements for the workplace.
Directive 89/656/EEC of November 30, 1989 on the minimum health and safety requirements for the use by workers of personal protective equipment at the workplace.
Directive 89/686/EEC of 21 December 1989 on the approximation of the laws of the Member States relating to protective equipment.
Regulation...
Directory
Manufacturers – Suppliers – Distributors (non-exhaustive list)
CATU – 10/20 Avenue Jean-Jaurès – BP 210/20 – 92222 Bagneux Cedex (France) http://www.catuelec.com
DERANCOURT – Lieu dit Ste Eugénie – BP 5 – 66270 Le Soler (France) http://www.derancourt.com
Sibille Fameca Electric...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!