1. Performance
This paragraph deals with the problem of contractual acceptance of combined-cycle power plants. Contracts include guarantees that must be verified when the plant is commissioned. These may be of very different kinds:
performance guarantee (power, specific consumption) ;
guarantee on atmospheric emissions (NO
x
, CO, dust);
environmental noise guarantee ;
flow, temperature and pressure of steam produced in the case of cogeneration plants.
Together, these parameters will constitute the plant's reference values, which will always...