2. How do you install, connect and commission a photovoltaic power plant to produce electricity and green hydrogen?
The administrative procedures required for the photovoltaic installation and the installation of the electrolyser are :
declaration of work to the town hall ;
Consuel certificate of electrical conformity;
ICPE 3420 declaration to the DREAL for the production of green hydrogen from photovoltaic electricity by electrolysis;
ICPE 4715 declaration to the DREAL for green hydrogen storage;
ICPE 1416 declaration to the DREAL for the distribution of green hydrogen.
The electrical installation of photovoltaic panels is shown in the following example.