1. Construction
The elements required for the correct implementation of a PV (photovoltaic) installation are derived directly from the technical inspection report, which should be adapted to the customer's portfolio of projects.
In addition to assessing the solar potential, this involves analyzing the electrical connection (single- or three-phase, size of existing socket, existing environment), assessing cable distances and routing, as well as the condition of the land or roof, and supplementing this information with a risk analysis.
For more information on photovoltaic system design, generator components and feasibility studies, see
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Construction