Conclusion
Online surveillance of steam generator installation based on Bond Graphs
Article REF: AG3551 V1
Conclusion
Online surveillance of steam generator installation based on Bond Graphs

Author : Belkacem OULD BOUAMAMA

Publication date: July 10, 2014 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Conclusion

The present paper follows on from an article [AG 3 550] on bond graph methodology and theory for the integrated design of supervisory systems robust to detection of parametric uncertainties. It concerns an industrial application for a steam generation plant. The complexity of this plant is due to the non-linearities introduced by the coupling and interaction of different phenomena (thermal, fluidic, thermodynamic, mechanical and electrical).

We then demonstrated the value of using bond graphs as multidisciplinary, unified tools based on energy exchange,...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Design and production"

( 139 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details