Logic of the developed method
Simplified risk analysis method for maintenance operations (AROM)
Article REF: MT9327 V1
Logic of the developed method
Simplified risk analysis method for maintenance operations (AROM)

Author : Christophe DUCAMP

Publication date: November 10, 2020 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. Logic of the developed method

Performance objectives lead the company to implement risk management rules throughout the product life cycle. These rules cover the three main stages in the product life cycle, namely :

  • stage 1 - development: from definition to design ;

  • stage 2 - production: from industrialization to production: manufacturing, integration, inspection and control ;

  • stage 3 - support: commissioning, maintenance and end-of-life.

The rationale behind the AROM method (Figure 1 ) is to anticipate the risks associated with product use and implementation during the product design and definition phase. The factors considered as potential hazards for the maintenance operator are...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Maintenance"

( 76 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details