Origin and objectives of the CWA-RBIF method
CWA-RBIM risk- and reliability-based maintenance method
Article REF: SE1677 V1
Origin and objectives of the CWA-RBIF method
CWA-RBIM risk- and reliability-based maintenance method

Author : Gilles ZWINGELSTEIN

Publication date: February 10, 2017 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

1. Origin and objectives of the CWA-RBIF method

1.1 Origin

The origin of the CWA-RBIM maintenance method stems from the European industrial community's desire for a risk- and reliability-based maintenance method, based on European maintenance and operational safety standards. In 2001, the European research project RIMAP "Risk-Based Inspection and Maintenance Procedures for European Industry" (GIRD-CT-2001-03008) was initiated . The aim of this project was to develop a systematic procedure for managing risk by...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Safety and risk management"

( 461 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us