4. Our advice
4.1 Determine the content of the impact study in relation to the scale of the works, the planned developments and their foreseeable impact on the environment.
It is therefore not necessary to deal in detail with all the themes identified above, either in the analysis of the initial state or in that of the effects and measures taken.
For example, in a facility where the only use of water would be for sanitary purposes, with wastewater connected to the community sewerage system, the main points to be addressed in detail for water will be limited to questions relating to :
to rainwater ;
the risk of accidental pollution from liquid spills and fire extinguishing water.
...
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference
This article is included in
Safety and risk management
This offer includes:
Knowledge Base
Updated and enriched with articles validated by our scientific committees
Services
A set of exclusive tools to complement the resources
Practical Path
Operational and didactic, to guarantee the acquisition of transversal skills
Doc & Quiz
Interactive articles with quizzes, for constructive reading
Our advice
Bibliography
Also in our database
Bibliography
Installations classées pour la protection de l'environnement (ICPE). Dossier de demande d'autorisation d'exploiter (DDAE) G 1 018 by G. GIRIN in Environnement 2009
Installations classées pour la protection de l'environnement (ICPE). Dossier de demande d'autorisation d'exploiter (DDAE) G 4 150 by G. GIRIN in Environnement 2009
Regulations
-
Articles L. 122-1 et seq. and R. 122-2 et seq.
articles L. 181-1 et seq. and R. 181-1 et seq.
Exclusive to subscribers. 97% yet to be discovered!
You do not have access to this resource.
Click here to request your free trial access!
Already subscribed? Log in!
The Ultimate Scientific and Technical Reference