3. Methodology proposed by PN ISI
The detailed presentation of the methodology proposed at the end of the PN ISI in 2012 can be downloaded free of charge from the website, action report A01 . This method is very similar to the NF ISO 23932 standard. The information and comments given below therefore complement this public information. The flow of the methodology is summarized in figure 2 , along with the desirable level of stakeholder involvement at each stage of an ISI study.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Methodology proposed by PN ISI
Article included in this offer
"Safety and risk management"
(
461 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
- (1) - BENEFEU - The potential benefits of fire safety engineering in the European Union. Benefits of fire safety engineering in the EU. - (EC CONTRACT EDT/01/503480) http://www.warringtonfire.net/registered/Benefeu%20Report.pdf ...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!