Conclusions on method B
Method B for the specification and realization of proven software and mission-critical systems
Article REF: SE2525 V1
Conclusions on method B
Method B for the specification and realization of proven software and mission-critical systems

Author : Jacques valancogne

Publication date: January 10, 2012 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

11. Conclusions on method B

The B method, which is constantly evolving, has proved its worth on a number of major industrial projects. It has been used in full on critical projects and in part on others. It has proved its effectiveness, both in terms of the quality achieved and in terms of costs, which have turned out to be lower than might have been feared at the outset, due to the fact that the finished product is achieved more quickly. The limitation of B is mainly linked to the transition from textual to formal specification. B's evolutions at system level enable us to go further back in the specification, and therefore to work not at software specification level, but at system specification level. The B methodology certainly represents an initial investment, but one that can be largely recouped later on. Engineering adaptation to integrate such a method should not be overlooked, and precautions must be taken to...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Conclusions on method B

Article included in this offer

"Safety and risk management"

( 461 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us