Feedback for continuous improvement of welding operations
Welding of the Main Components of Pressurized Water Recator Nuclear Power Plants

Add to my library

BN3732 V1 Article

Feedback for continuous improvement of welding operations


Welding of the Main Components of Pressurized Water Recator Nuclear Power Plants

Authors : Denis BUISINE, Gérard PERRAT

Publication date: January 10, 2016 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

3. Feedback for continuous improvement of welding operations

Taking advantage of the high level of series production in France's nuclear power plants, as well as achievements in other countries (South Africa, South Korea, USA, China, etc.), feedback from manufacturing and operation has led to numerous improvements.

3.1 Manufacturing feedback

This manufacturing feedback has led to changes in a number of parameters in several areas:

  • base materials (for example, the replacement of Inconel 600MA GV tubes with Inconel 690TT, see

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Feedback for continuous improvement of welding operations

Article included in this offer

"Material processing - Assembly"

( 174 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Contenus associés

Sur le même sujet

Veille personnalisée : Inscrivez-vous !
Contact us