5. Plutonium multi-recycling in 4th generation nuclear reactors
5.1 Scenarios studied
The focus here is solely on scenarios for the deployment of a complete or partial plutonium-recycling RNR fleet, in cohabitation with PWRs, in this case EPRs. These scenarios illustrate the performance of the closed uranium/plutonium cycle. The scenarios are as follows:
deployment of a complete RNR-Na park in two stages from 2040, called RNR_2040 (figure 5 );
...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Plutonium multi-recycling in 4th generation nuclear reactors
Article included in this offer
"Nuclear engineering"
(
160 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
- (1) - CEA Direction de l'énergie nucléaire - La gestion durable des matières radioactives avec les réacteurs de 4e génération. - Déc. 2012 http://www.cea.fr/
- (2) - Loi n° 91-1381 du 30 décembre...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!