3. Administrative procedures and timetable
Once a site has been selected as the most suitable for a nuclear power plant, the French public authorities require a public debate to be held, focusing on the objectives and main features of the project, as well as its foreseeable implications. On the basis of a preliminary dossier, the debate is conducted by a special commission, which draws up a report. An independent national commission then draws up an assessment of the debate. These documents are forwarded to the relevant authorities for a decision on whether or not to continue the procedures.
The next step is to obtain the necessary official authorizations.
3.1 Administrative procedures
In France, the sequence of these procedures for the design and construction phases is such...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Administrative procedures and timetable
Article included in this offer
"Nuclear engineering"
(
160 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Additional technical data
1. Nuclear power plants. General installation
The scale of the electronuclear program to which France committed itself in 1974 led Électricité de France to design standard products, mass-produced but adaptable to different sites. Standardization is based on the choice of a single technology, that of pressurized water reactors (PWRs), and on the grouping together of the main manufacturers: Framatome for...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!