Practical sheet | REF: FIC1820 V1

Install a wind farm to produce electricity and green hydrogen

Author: Khadidiatou CAMARA

Publication date: November 10, 2023 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


4. Mistakes to avoid

4.1 Don't neglect empowerment

Failure to obtain GWO, SST, electrical and ATEX approvals to install a wind farm or electrolyser will result in administrative, financial and criminal penalties, following inspection by the public authorities and the inspector responsible for certifying the installation.

SCROLL TO TOP
You do not have access to this resource.

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!


The Ultimate Scientific and Technical Reference

A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
+ More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

This article is included in

Energy resources and storage

This offer includes:

Knowledge Base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

Practical Path

Operational and didactic, to guarantee the acquisition of transversal skills

Doc & Quiz

Interactive articles with quizzes, for constructive reading

Subscribe now!

Ongoing reading
Mistakes to avoid