Controls
Technical insulation: Thermal insulation of equipment
Article REF: BE9850 V2
Controls
Technical insulation: Thermal insulation of equipment

Author : Denis PETIT

Publication date: March 10, 2022 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Controls

Insulation testing is difficult and error-prone. There are currently no recognized methods, standards or norms.

Inspections can be carried out after the work has been completed, to check that the insulation has been properly installed, or during the life of the installation, to assess the condition and ageing of the insulation.

Control can be performed in two ways:

  • quality control, to check that the insulation system has been properly installed;

  • a quantitative check, to verify the thermal objectives of the insulation.

In addition to visual inspection, we'll look at inspections according to the type of equipment:

  • thermograph, for quality control;

  • ...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Industrial thermal engineering"

( 38 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us