Article | REF: BE9743 V1

Industrial refrigerating machines

Author: Georges VRINAT

Publication date: October 10, 2009 | Lire en français

You do not have access to this resource.
Click here to request your free trial access!

Already subscribed? Log in!

Automatically translated using artificial intelligence technology (Note that only the original version is binding) > find out more.

    A  |  A

    3. Installation and commissioning

    Installation and commissioning of a system are carried out by the installer under the supervision of the client, but more generally by the project manager. It should be remembered that the project owner is the natural or legal person who finances the operation and then becomes the owner of the installation, and that the project manager has been chosen by the former to ensure the completion of the project.

    The installer's technical proposal, based on the specifications drawn up by the project manager and accepted by the client, forms part of the contract and defines the responsibility and performance limits of the contractor (builder or installer).

    Installation operations can be broken down into three phases: preliminary studies, site work, commissioning and testing.

    You do not have access to this resource.

    Exclusive to subscribers. 97% yet to be discovered!

    You do not have access to this resource.
    Click here to request your free trial access!

    Already subscribed? Log in!


    The Ultimate Scientific and Technical Reference

    A Comprehensive Knowledge Base, with over 1,200 authors and 100 scientific advisors
    + More than 10,000 articles and 1,000 how-to sheets, over 800 new or updated articles every year
    From design to prototyping, right through to industrialization, the reference for securing the development of your industrial projects

    This article is included in

    Industrial cooling

    This offer includes:

    Knowledge Base

    Updated and enriched with articles validated by our scientific committees

    Services

    A set of exclusive tools to complement the resources

    Practical Path

    Operational and didactic, to guarantee the acquisition of transversal skills

    Doc & Quiz

    Interactive articles with quizzes, for constructive reading

    Subscribe now!

    Ongoing reading
    Installation and commissioning