7. Urban tunnels with authorized clearance less than (or equal to) 3.50 m
These tunnels are normally closed to TDG.
Three gauges are used: 2 m, 2.70 m and 3.50 m. Smoke extraction systems are required for tunnels longer than 300 m, and safety provisions are governed by the same rules as for other tunnels.
7.1 Differences requiring special provisions
Here are 3 points to consider:
emergency vehicle access for tunnels with a gauge of 2 to 2.7 m, which do not allow the use of standard fire-fighting vehicles: only asphyxiated and injured rescue vehicles (VSAB) can enter tunnels with a gauge of 2.70 m. In all other cases, specific provisions concerning rescue operations and the size of their vehicles will have to be studied;
underground...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Urban tunnels with authorized clearance less than (or equal to) 3.50 m
Article included in this offer
"Public works and infrastructure"
(
88 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!