2. Concrete veil with ITI (60 + 10), winter season
2.1 Parameters studied
Successively, in the winter context, the conditions of the following five variables will be analyzed:
T e = - 5 °C and HR e = 95%.
T e = 0 °C and HR e = 95%.
T e = 5 °C and HR e = 95%.
T e = 7 °C and HR e = 95%.
T e = 10 °C and HR...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Concrete veil with ITI (60 + 10), winter season
Article included in this offer
"Pathologies and building rehabilitation"
(
51 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!