Glossary
Construction cycle - Equipment rotation
Article REF: TBA525 V2
Glossary
Construction cycle - Equipment rotation

Author : Pierre SERIN

Publication date: March 10, 2017 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Glossary

Adjudicator

Company awarded the work following a call for tenders.

Banche

Formwork-tool used to build vertical walls. Formwork panels are generally joined together in pairs (one per face), but can also be assembled in "trains" to form a longer unit, thus forming a single tool.

Buttressing

Setting up inclined or horizontal shoring in a trench or formwork.

Tool form

A mold prepared for casting concrete, made from reusable, industrially-machined materials such as formwork panels or tables, as opposed to formwork produced by hand in a workshop or on site.

Credit hours

Total number of man-hours planned for each day of the cycle.

Crinoline...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Preparing for construction"

( 117 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us