6. Smoke extraction in enclosed horizontal corridors and halls accessible to the public (DF 6)
In the case of enclosed horizontal corridors with natural or mechanical smoke extraction, there is no obligation in the following cases:
corridors with a total length of more than 30 m ;
corridors served by pressurized staircases;
corridors serving sleeping areas ;
basement circulation.
Halls are considered to be corridors (section 9.1 of article
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Smoke extraction in enclosed horizontal corridors and halls accessible to the public (DF 6)
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!