1. General
1.1 Establishments subject to regulation (article SG 1)
The provisions of articles SG are applicable to structures whose walls and roofing are made up, in whole or in part, of a flexible envelope supported by air introduced under pressure, either directly or via inflatable reinforcements, whatever the size of the audience.
Inflatables must not house the following premises or installations:
stage areas with M 2, M 3 or M 4 underpinnings or scenery;
cinematographic projection installation using equipment operating with an arc lamp not installed in a sealed enclosure without gas exchange with the outside ;
sleeping quarters ;
...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
General
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Also in our database
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!