7. Budget estimate
7.1 Workforce
The company takes the "dossier de consultation des entreprises" (DCE), or the "decomposition du prix global et forfaitaire" (DPGF) file, which must be in the DCE. It extracts the values:
of the total volume of concrete (foundation, elevation...) ;
of the total floor area, including paving.
She then searches "her database" for the ratio of man-hours for all concretes.
Multiplying the total concrete ratio in cubic meters by the ratio laid in h/m 3 gives an estimate of the manpower required.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Budget estimate
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
- (1) - HAXAIRE (P.), DEBAVEYE (H.) - 170 séquences pour mener une opération de construction, - Le Moniteur, 2020.
- (2) - COUFFIGNAL (D.), BÉRAUD-GUÈNARD (S.) - Correspondancier des opérations de construction, - 2013.
Also...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!