8. Organization of site preparation
Site preparation depends on the size and complexity of the operation, but also, and above all, on the degree of progress made in drawing up the documents described above (figure 5 ):
list of speakers ;
site review and connection projects ;
PEO (plan d'exécution des ouvrages) and construction schedule ;
list of technical justifications ;
list of special points ;
list of hot spots ;
interface list ;
list of stopping...