4. On-site maintenance
4.1 General
The instructions given in the manufacturer's operating and maintenance manual must be scrupulously followed.
Before any work is started, access and manoeuvring bans must be placed on the controls. Remember that maintenance must be carried out by specialized personnel, i.e. the crane operator if he or she has been trained to do so, or by a trained millwright; maintenance must be carried out with the machine at a standstill.
Some operations require the equipment to be started up. At this point, the crane operator must be at his post and in constant contact with maintenance personnel.
Work on electrical cabinets requires specific authorization.
It is forbidden to work under a machine...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
On-site maintenance
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
- Guide technique du 18 novembre 2014 relatif aux opérations de modification des machines en service, - https://travail-emploi.gouv.fr/publications/picts/bo/20141130/TRE_20140011_0110 _0001.pdf (2014)....
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!