Study of the installation of a new DC network in Brittany
AC and DC Networks Association. Setting Up and Utilisation
Quizzed article REF: D1164 V1
Study of the installation of a new DC network in Brittany
AC and DC Networks Association. Setting Up and Utilisation

Author : Michel PINARD

Publication date: August 10, 2014, Review date: June 24, 2021 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

5. Study of the installation of a new DC network in Brittany

5.1 First approach: we essentially install accumulator batteries

Wind, water and photovoltaic installations produce intermittent energy that is difficult to manage. Battery storage provides a reserve that is theoretically available to local consumers in all scenarios. This approach assumes relatively low investment in renewable energies, at least in the near future. In this case, the 2 × 36 kV network can initially be reduced to a simple Brest – Quimper link in Finistère (see layout B-Q in figure 9 ).

Batteries are mainly...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Study of the installation of a new DC network in Brittany

Article included in this offer

"Conversion of electrical energy"

( 273 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us